1. Requirement review
Confirm product route, market, users, wireless path, software boundary and sample goal.
Use the sample to prove the path. Use pilot and release records to protect production.
A sample proves the selected product path. Production needs locked requirements, representative validation, release records and repeatable tests.
Each stage should close one set of decisions before the next build.
Confirm product route, market, users, wireless path, software boundary and sample goal.
Build or configure the device, firmware, app or dashboard flow needed to prove the main use case.
Use representative users, installation conditions, networks and operating roles to find field constraints.
Lock versions, materials, programming steps, functional tests, packaging and production records.
A product is ready when the approved configuration can be built, programmed, tested and checked repeatedly.
A sample proves the selected product path and core experience. A production release requires locked requirements, validation records, version control, materials, programming methods, tests and packaging scope.
Pilot testing should happen after the sample represents the intended product behavior and before the production baseline is locked. The pilot should use representative users, sites, networks and operating roles.
Pricing can change when certification scope, software ownership, test requirements, packaging, materials, forecast, MOQ or delivery schedule changes after the sample review.